Full tear-off and disposal
We strip the existing shingles, tiles, or membrane, load it into a dumpster, and haul it off. Decking gets inspected from the attic side with a moisture meter before any new underlayment goes down.
When you hire steel roofing contractors Cutler Bay FL homeowners actually keep on speed dial, you get panels engineered for 150 mph wind uplift, not shingles that peel off in the first named storm. Elyndor Forge Group installs standing seam and exposed-fastener metal systems on homes from Saga Bay to Cutler Ridge. We pull the Miami-Dade County NOA paperwork, match the panel to your roof pitch, and leave the yard clean. Steel roof installers in Cutler Bay, five years running.

Steel roofing contractors Cutler Bay FL install metal panel systems that replace asphalt shingles, clay tiles, and failing flat-roof membranes. The work starts with a deck inspection, then new underlayment and ice and water shield along the valleys and eaves, followed by 24-gauge standing seam or 26-gauge exposed-fastener panels cut to length on site. We fasten through the high ribs, set ridge vents and drip edge, and seal every penetration with roof sealant rated for Florida UV. A typical residential tear-off and re-roof runs four to seven days depending on square footage and how many layers come off.
Cutler Bay sits in a wind-borne debris region, so your roof has to pass Miami-Dade County NOA testing before it ever goes on the deck. That matters when you file an insurance claim after storm damage or hail damage, because adjusters check the product approval number against the Florida Building Code. If you have been searching for steel roofing contractors near me in Cutler Bay FL after a leak showed up over the living room, the fix is usually flashing failure at a sidewall or a rusted fastener, not the whole roof. We diagnose first, then quote.
Every steel roof installation we do in Cutler Bay includes the full scope from tear-off to final walk, with the permit and NOA paperwork handled for you. Add-ons like deck replacement, gutter work, or skylight flashing are quoted separately once we see the roof.
We strip the existing shingles, tiles, or membrane, load it into a dumpster, and haul it off. Decking gets inspected from the attic side with a moisture meter before any new underlayment goes down.
Synthetic underlayment covers the field, with ice and water shield at the eaves, valleys, and any penetration. This is the layer that keeps wind-driven rain out if a panel ever lifts.
Standing seam or exposed-fastener panels cut to length on site, fastened to the NOA fastener schedule, with ridge vents and drip edge set as we go. No face-fastening through the flat of the panel.
Chimney, sidewall, and vent flashing gets replaced, not reused. We seal every penetration with roof sealant rated for Florida UV and salt exposure, then water-test the critical areas.
We pull the Miami-Dade County permit, file the product approval, and hand you copies of the NOA, fastener schedule, and warranty paperwork at the final walk.
Magnetic sweeper over the lawn and driveway, leaf blower through the gutters, and a roof walk with you to review the install. You get a maintenance schedule before we leave.
We walk the roof, check the deck from the attic side with a moisture meter, and photograph any soft spots, fascia rot, or soffit damage. You get a written scope with panel options and a firm price. Most inspections take 45 to 60 minutes.
We pull the Miami-Dade County permit and submit the product approval number for your chosen panel. This step takes three to ten business days depending on the municipality. You do not touch the paperwork.
Crews strip the old shingles or tiles, haul them off in a dumpster, and replace any rotted decking with new plywood. A 2,000-square-foot tear-off usually runs one to two days. We tarp the roof every night until panels go on.
We roll synthetic underlayment and ice and water shield at the eaves and valleys, then set the steel panels with a roofing nail gun and screw-fastened clips. Panels are cut on site with a shingle cutter and nibbler to avoid metal shavings staining the finish.
We run a magnetic sweeper across the lawn and driveway for stray fasteners, blow off the gutters with a leaf blower, and walk the roof with you. You get the NOA paperwork, warranty documents, and a maintenance schedule before we pull out.
We walk the roof, check the deck from the attic side with a moisture meter, and photograph any soft spots, fascia rot, or soffit damage. You get a written scope with panel options and a firm price. Most inspections take 45 to 60 minutes.
Drives underlayment and decking fasteners at consistent depth so nothing backs out later. We set the pressure per the fastener manufacturer spec.
Cuts steel panels to length on site without heat, which keeps the Kynar finish from burning or flaking at the cut edge.
OSHA-compliant fall protection for every crew member on every pitch. No exceptions, no shortcuts on a two-story roof.
Checks the deck and attic framing for hidden moisture before we cover it with underlayment. Soft decking gets replaced, not roofed over.
Runs the lawn and driveway at the end of every job to pick up stray fasteners and metal shavings before anyone walks barefoot.
Layout for panel courses and fastener spacing, so the finished roof lines up square and the clip pattern matches the NOA.

A 1,900-square-foot home with 17-year-old asphalt shingles, three missing shingle patches, and a non-renewal notice from the insurer. Attic temps hit 145 degrees in August.
After: Full tear-off, deck repair on two soft sheets, and 24-gauge standing seam panels with a current NOA. Attic temps dropped to 122 degrees and the policy was rewritten with a wind mitigation credit.
Book this service →
A squall lifted four panels and drove rain through the ridge vent, staining two ceilings. The homeowner needed the roof dried in the same day.
After: Emergency tarp that afternoon, replacement panels matched to the existing profile within a week, and new ridge vent flashing. Total repair came in at $1,400 and the claim was documented with photos.
Book this service →
A commercial building with a low-slope membrane roof that had been patched three times in two years. Ponding water sat near the drains after every heavy rain.
After: Tear-off, tapered insulation to correct the slope, and a standing seam metal system tied into the existing parapet. Drains now clear within an hour of a downpour and repairs have stopped.
Book this service →Most of the calls we get are not about wanting a new roof, they are about a problem that will not go away. Here are the four we see most often in Cutler Bay, and how we handle each one.
Ask a pro →We trace the leak to its actual entry point, usually flashing failure or a rusted fastener uphill from the stain. Then we repair or replace the affected panels and water-test before we leave.
When shingles are past their service life, patching is throwing money at a losing roof. We quote a steel roof replacement Cutler Bay FL homeowners can pass inspection with, and we document the upgrade for your insurer.
We inspect the panel finish and fasteners, treat surface rust where it is isolated, and replace panels where corrosion has compromised the metal. Coastal homes in Bayshore and Saga Bay see this most.
We re-slope or add tapered insulation where the drainage is wrong, re-seam the metal, and clear the drains. For carports and additions, we can tie the flat section into a new steel system.
Most residential steel roof installations in Cutler Bay run $18,000 to $42,000 in 2026, depending on square footage, panel gauge, and how many layers come off. Standing seam costs more than exposed-fastener. A repair like a lifted panel or failed flashing typically runs $450 to $1,800. We give you a firm written number after the inspection, not a per-square guess.
The best steel roofing contractors Cutler Bay homeowners hire carry a Florida Roofing License (RR), install only Miami-Dade NOA-approved panels, and put the fastener schedule in writing. Check the license number, ask for the NOA, and confirm they carry workers comp. We meet all three, and we will send you the paperwork before you sign anything.
A Galvalume or Kynar-finished steel roof lasts 40 to 70 years in Cutler Bay's coastal air, versus 12 to 18 years for asphalt shingles. Salt spray and UV are the two things that age metal here, so we spec finishes rated for coastal exposure. Fasteners and sealant get checked every two years and touched up as needed.
Yes. Steel roofing is one of the best fits for Cutler Bay because it handles wind uplift, salt air, and summer heat better than shingles or tile. It carries a Miami-Dade NOA, reflects heat off the attic, and often earns an insurance discount. The main trade-off is up-front cost, which is why we walk you through panel options at different price points.
Licensed, insured, and NOA-compliant on every panel. Call (855) 960-5906 and we will schedule a free roof inspection, usually the same day. You get a written price, the product approval number, and a crew that cleans up before it leaves.
Get Free Estimate (855) 960-5906 →Call (855) 960-5906 or email [email protected] and we will get you on the schedule. We answer 24/7 for emergencies and book standard inspections within 24 hours. If you are in ZIP codes 33190, 33157, or 33189, we are already in your area.